HOME     |     CONTACT     |    
  
project image
project image

FAIRFIELD PUMP STORAGE INSTRUMENTATION

Jenkinsville, South Carolina

For SCE&G’s Fairfield Pumped Storage hydroelectric plant, FME installed four piezometers in Dam B and repaired two damaged relief wells in Dam A by placing three-inch diameter sleeves in damaged-relief wells. The generating station is a hydroelectric plant located on the Monticello Reservoir immediately northwest of V.C. Summer Nuclear Station. Piezometer installation occurred on a steep slope that required navigation over and around several fixed obstacles.